Data center general contractors, ranked
Compare 64 data center general contractors by ENR rank, revenue, delivery model and own-crew trades. HITT leads ENR’s 2026 telecommunications ranking with $10.65 billion of 2025 sector revenue↗, ahead of Turner ($9.33 billion)↗, Holder and DPR; ENR’s top 20 billed $83.4 billion. Records cover North America, Europe, the Middle East and Asia-Pacific, each with dated sources.
Last verified
| Delivery models | Markets | ||||||
|---|---|---|---|---|---|---|---|
| HITT Contracting | 14 | 10,653.54 | 824 | 84 | CM at risk | North America | 2026-11-11 |
| Turner Construction | 23 | 9,334.43 | 333 | 13 | CM at risk | North America | 2026-11-11 |
| Holder Construction | 33 | 8,5273 | 833 | 123 | CM at risk, Design-build | North America | 2026-11-11 |
| DPR Construction | 44 | 8,059.44 | 574 | 74 | CM at risk, Design-build, Preconstruction | North America, Europe | 2026-11-11 |
| Mortenson | 54 | 4,833.14 | 454 | 104 | CM at risk | North America | 2026-11-11 |
| Clayco | 62 | 4,706.22 | 582 | 202 | Design-build | North America | 2026-11-11 |
| Whiting-Turner | 72 | 3,895.82 | 272 | 52 | CM at risk | North America | 2026-11-11 |
| STO Building Group (Structure Tone) | 93 | 3,5293 | 233 | 33 | CM at risk | North America, Europe | 2026-11-11 |
| Fortis Construction | 102 | 3,289.92 | 922 | 462 | CM at risk | North America, Europe | 2026-11-11 |
| Hensel Phelps | 114 | 2,973.24 | 284 | 114 | CM at risk | North America | 2026-11-11 |
| Walbridge | 124 | 2,791.54 | 454 | 264 | CM at risk | North America | 2026-11-11 |
| JE Dunn Construction | 133 | 2,6863 | 333 | 213 | CM at risk | North America | 2026-11-11 |
| Clune Construction | 143 | 2,5703 | 713 | 453 | CM at risk | North America | 2026-11-11 |
| Gray | 154 | 2,5154 | 474 | 304 | CM at risk, Design-build | North America | 2026-11-11 |
| The Walsh Group | 164 | 2,252.54 | 254 | 164 | CM at risk, Design-build, Preconstruction | North America | 2026-11-11 |
| Suffolk Construction | 172 | 2,180.92 | 282 | 232 | CM at risk | North America | 2026-11-11 |
| Brasfield & Gorrie | 184 | 2,028.54 | 264 | 244 | CM at risk, Design-build | North America | 2026-11-11 |
| T5 Construction Services | 192 | 1,666.32 | 1002 | 802 | Design-build | North America | 2026-11-11 |
| Ryan Companies | 203 | 1,3833 | 293 | 333 | CM at risk | North America | 2026-11-11 |
| AECOM Tishman | — | — | 52 | 182 | CM at risk | North America | 2026-11-11 |
| Black & Veatch | — | — | 54 | 494 | CM at risk, EPC | — | 2026-11-11 |
| Bouygues Construction | — | — | — | — | Design-build | Europe, APAC | 2026-11-11 |
| Burns & McDonnell | — | — | 03 | 353 | CM at risk, Design-build | North America | 2026-11-11 |
| Cap Ingelec | — | — | — | — | Design-build | Europe | 2026-11-11 |
| Clark Construction | — | — | 124 | 154 | CM at risk, General contracting | North America | 2026-11-11 |
| Collen Construction | — | — | — | — | Design-build | Europe | 2026-11-11 |
| CPB Contractors | — | — | — | — | — | APAC | 2026-11-11 |
| EllisDon | — | — | — | — | General contracting, Preconstruction | North America | 2026-11-11 |
| Equans Data Centers | — | — | — | — | Design, Construction, Commissioning | Europe | 2026-11-11 |
| Exyte | — | — | — | — | Design-build | Europe | 2026-11-11 |
| FDC Construction & Fitout | — | — | — | — | Design and construction | APAC | 2026-11-11 |
| Fluor | — | — | 04 | 94 | EPC, General contracting | North America, Europe, APAC | 2026-11-11 |
| Gammon Construction | — | — | — | — | Design-build | APAC | 2026-11-11 |
| Gilbane Building Company | — | — | 23 | 193 | CM at risk, Design-build, IPD | North America | 2026-11-11 |
| Glencar Construction | — | — | — | — | General contracting (Contractor Alliance with ESG) | Europe | 2026-11-11 |
| Hoffman Construction | — | — | 04 | 314 | CM at risk | North America | 2026-11-11 |
| Hutchinson Builders | — | — | — | — | Design-build | APAC | 2026-11-11 |
| Hyundai Engineering & Construction | — | — | — | — | General contracting, Preconstruction | APAC | 2026-11-11 |
| Implenia | — | — | — | — | General and total contracting | Europe | 2026-11-11 |
| John Paul Construction | — | — | — | — | Design-build | Europe | 2026-11-11 |
| John Sisk & Son | — | — | — | — | General contracting, CM at risk, Design-build | Europe | 2026-11-11 |
| Kajima | — | — | — | — | Design-build | APAC | 2026-11-11 |
| Kapitol Group | — | — | — | — | General contracting, Design management | APAC | 2026-11-11 |
| Kiewit | — | — | 43 | 43 | CM at risk, General contracting | North America | 2026-11-11 |
| Laing O’Rourke | — | — | — | — | Design and construction, Offsite manufacture | Europe, Middle East, APAC | 2026-11-11 |
| Larsen & Toubro (L&T Construction) | — | — | — | — | Design-build | APAC | 2026-11-11 |
| Lendlease | — | — | — | — | General contracting | APAC | 2026-11-11 |
| Mace Construct | — | — | — | — | General contracting (cold-shell construction) | Europe | 2026-11-11 |
| McCarthy Building Companies | — | — | 104 | 224 | CM at risk | North America | 2026-11-11 |
| Mercury Engineering | — | — | — | — | General contracting | Europe | 2026-11-11 |
| Multiplex | — | — | — | — | Early Contractor Involvement, Design-build | APAC | 2026-11-11 |
| Obayashi | — | — | — | — | Design-build | APAC | 2026-11-11 |
| Okland Construction | — | — | — | — | Construction management, Design-build | North America | 2026-11-11 |
| PCL Construction | — | — | 24 | 144 | CM at risk | North America | 2026-11-11 |
| Pomerleau | — | — | — | — | Construction management | North America | 2026-11-11 |
| Samsung C&T | — | — | — | — | Preconstruction, Design and construction | APAC | 2026-11-11 |
| Shapoorji Pallonji | — | — | — | — | Turnkey IT-campus construction with data centre integration | APAC | 2026-11-11 |
| Shimizu Corporation | — | — | — | — | General contracting | APAC | 2026-11-11 |
| Skanska USA | — | — | 122 | 172 | CM at risk | North America, Europe | 2026-11-11 |
| STRABAG | — | — | — | — | Design-build | Europe | 2026-11-11 |
| Sundt Construction | — | — | 113 | 423 | CM at risk | North America | 2026-11-11 |
| Taisei Corporation | — | — | — | — | Design-build | APAC | 2026-11-11 |
| Tata Projects | — | — | — | — | EPC | APAC | 2026-11-11 |
| Winthrop Technologies | — | — | — | — | Design-build | Europe | 2026-11-11 |
How this table is built
Full methodologyRankings and revenue come from ENR’s 2026 Top 400 Contractors tables. Delivery models, self-perform capabilities, megawatts and clients come from company pages and releases. The small arrow next to a figure opens its source. Empty cells mean the field was not verified in the sources reviewed.
Each row carries the date we last checked it, and the newest check was 11 Nov 2026. Spot a stale number? Email hello@datacentergeneralcontractors.com with the source and we update the row. For builders ranked by megawatts delivered and reference projects, see datacenterconstructioncompanies.com.
Free to reuse under CC BY 4.0 with a link to this page: CSV, JSON, llms.txt.
Questions owners ask
Who are the largest data center general contractors?
By 2025 revenue in ENR’s 2026 telecom and data center ranking: HITT Contracting ($10.65 billion), Turner Construction ($9.33 billion), Holder Construction ($8.53 billion), DPR Construction ($8.06 billion) and Mortenson ($4.83 billion). ENR’s telecommunications sector covers data centers, cabling and towers, and ENR credits the data center buildout for its 86.4% growth in 2025. Together the top 20 billed $83.4 billion in the sector.
CM at risk, design-build or EPC: how do data center contractors contract?
Under CM at risk the owner hires the designer and brings the builder in early under a guaranteed maximum price. HITT and Suffolk delivered 100% of 2025 revenue that way, Holder 92% and DPR 90%. Under design-build one firm carries design and construction: Clayco, Gray and Brasfield & Gorrie sell it as their main offer. EPC adds engineering and procurement of the power plant, which is how Fluor, Black & Veatch and Tata Projects contract.
Sources: HITT, Suffolk, Holder, DPR, Clayco, Gray, Fluor, Black & Veatch
Which data center contractors self-perform electrical work?
DPR, McCarthy, Sundt and Laing O’Rourke publish in-house electrical capabilities. Clark lists C3M Power Systems and Black & Veatch lists Bird Electric for utility infrastructure. Turner self-performs concrete, drywall and site civil work; Gray’s NexGen arm does concrete, steel and mechanical. Ask each bidder which of those crews it will put on your site.
Sources: DPR, McCarthy, Sundt, Laing O’Rourke, Clark, Black & Veatch, Turner, Gray
How many megawatts have the biggest builders delivered?
Mortenson reports 11 GW completed or under construction and Clayco 10.2 GW delivered or underway. Gray reports 1,900 MW+ delivered, JE Dunn 720 MW delivered in 2024 alone, Bouygues Construction 800 MW+ and Collen 600 MW+ since 2010. The bases differ: delivered, underway and annual figures answer different questions. Reference project capacity is shown separately and keeps planned and ultimate capacity qualifiers.
How much of each contractor’s business is data centers?
In ENR’s 2026 Top 400 table, telecom and data center work made up 100% of T5 Construction’s 2025 revenue, 92% of Fortis Construction’s, 83% of Holder’s, 82% of HITT’s and 71% of Clune’s. Turner sits at 33% and Mortenson at 45%. A high share means a specialist team and supply chain; a low share means a larger general builder with a data center group inside it.
Which contractors build data centers in Europe?
Irish builders lead: Winthrop Technologies has 430 MW+ of IT load in flight across seven countries, Collen has delivered 600 MW+, Mercury Engineering handed over Digital Realty’s 76 MW Paris Digital Park and Sisk builds for Vantage. Exyte booked about 80 MW near Frankfurt in 2026, and DPR, Fortis, Fluor and Skanska bring US and Nordic programs.
Can I reuse this data?
Yes. The full table is free to reuse under CC BY 4.0 with a link to datacentergeneralcontractors.com, as CSV or JSON. Every record carries its source URLs and access dates.